Intel’s 916,000-pound shipment is a “cold box,” a self-standing air-processor structure that facilitates the cryogenic technology needed to fabricate semiconductors. The box is 23 feet tall, 20 feet wide, and 280 feet long, nearly the length of a football field. The immense scale of the cold box necessitates a transit process that moves at a “parade pace” of 5-10 miles per hour. Intel is taking over southern Ohio’s roads for the next several weeks and months as it builds its new Ohio One Campus, a $28 billion project to create a 1,000-acre campus with two chip factories and room for more. Calling it the new “Silicon Heartland,” the project will be the first leading-edge semiconductor fab in the American Midwest, and once operational, will get to work on the “Angstrom era” of Intel processes, 20A and beyond.

I don’t know why, but I’ve never thought of the transport logistics involved in building a semiconductor fabrication plant.

  • JasonDJ@lemmy.zip
    link
    fedilink
    English
    arrow-up
    0
    ·
    edit-2
    16 days ago

    I agree with you…the cost of a gallon of gas is, and has always been, less than the cost to remove a gallon of gas worth of CO2 from the atmosphere, and I don’t think the price should ever have been less than that amount. I don’t think that’s an unfair position, cleaning up your mess should be a part of the cost of the good.

    But man what a way to fuck the majority of the 99%.