• 0 Posts
  • 72 Comments
Joined 1 year ago
cake
Cake day: July 16th, 2023

help-circle






  • At least for games, I check how big is the dev team, anything bigger than 30 then pirate Then I check if owner of the development studio is public company, if yes then pirate Then I check if owner owns more than one development studio, if yes then pirate Then I check how many games studio has released, if more than 10, pirate Then I check how many copies have been sold on steam, more than 1m, pirate

    If a game dev team fails all above checks, I will still pirate first, but if i enjoy pirated copy, I’ll buy the game to support the dev.











  • Coal power can’t really be used for on-demand scenarios, as coal fired power plants have massive startup costs and also time. Compared to a gas-turbine that can do a cold boot up to maximum production in 15 minutes. Coal needs about 4-5 hours to come to full power and that is with the best expensive technology we have not necessarily technology that is in use. Also coal plants take about 2 hours to shutdown and about 20 hours to be ready to be fired again. It’s just a limitation that we can’t overcome from complications due to coal being a solid fuel.

    So whatever coal China has it must be using for baseload, they must have more alternatives if their coal fired capacity is decreasing.

    EDIT: adding more context, so I have been hearing this coal as peak load instrument for a while now, so I decided to dig deeper on who is claiming this and why? So there are two claims in this space out there 1st being that for larger plants that can operate at sub 20% capacity can scale between sub20% to 100% in minutes making them useful for peak load, and that is just stupid argument as whatever minimum they are running it is still baseload.

    Other argument is actual redisgn of plants that allow for quick cycling, but technology is new and they can cycle even 4x in a day, but they operate at relatively less efficiency and also since they don’t ever go cold they start plants semi hot, they can’t clean the boiler with forced draft, leading to increased maintenance cost during full cleanup shutdown significantly and also they deal with thermal stress a lot more leading to increased cost of wear and tear. Seems like only CGS has been able to operate using this model and their gen capacity is only 480mW so seems like a proof of concept idea than actual possi ility of turning coal into peak load.

    But at least it looks possible with some research, contrary to my previous opinion that it’s not possible at all, but seems to be still years before it can reach baseload efficiency and last thing we want to do is run coal at worse efficiency.